English Wikipedia - The Free Encycl...
Download this dictionary
Capanda Dam
The Capanda Dam is a hydroelectric dam on the Kwanza River in Malanje ProvinceAngola. Built in 1987–2007 years the Russian company Tekhnopromexport, general designer - the institute Hydroproject (Chief Engineer - Ph.D Fedosov V.E.) The facility generates power by utilizing four turbines and each, totalling the installed capacity to . Total cost of US$4 billion. An additional cost of more than US$400 million was spent in repairing the damage caused during UNITA's occupation of the area at the time of the Angolan Civil War in 1992 and 1999.

See more at Wikipedia.org...


© This article uses material from Wikipedia® and is licensed under the GNU Free Documentation License and under the Creative Commons Attribution-ShareAlike License